GTV9 Redevelopment, Richmond, Victoria.

Biofilta was engaged by Lend Lease to supply and install a compact stormwater harvesting and treatment system for the iconic GTV9 Studio redevelopment in Richmond.

The system includes our unique treatment train and stacked tank configuration to provide 75m³ of primary storage which is then filtered through a 3 tier 50m² Biofilta vegetated planter. Filtered water is then collected in a 50m³ re-use tank for on-site irrigation needs with over 75% reliability.

Meeting the Greenstar Category C rating criteria for the 3ha development site in such a small footprint requires a Biofilta treatment train approach. All this performance is achieved without the need for chemicals or cartridges.

METADATA-START 20140611_140406